There’s one plan, one aim for us in 2021 – more independence. Since we’ve managed to become independent when it comes to manufacturing clothes, this year, it’s time to be that when it comes to electric power. We have already assigned a budget for a solar power plant capable to fulfil all electricity needs of our factory in south-eastern Serbia. We should start creating solar energy in the second or third quarter of 2021.
We’re in process of covering the roofs of our facilities with solar panels.
Our quest for autonomy doesn’t end with energy. We intend to make food independently too. Oraovica factory stands on a big lot of land and there’s plenty of room for greenhouses and even an animal farm. And since starting this year, our factory kitchen will start working, it’s ideal time to slowly start supplying it with our own produce.
Of course, to have a functioning farm, you need to solve irrigation. We already have dug water wells that can support this cause. We’ll make an extra step this year – we’ll make the wastewater from the factory safe for watering the plants. Now, we already have a wastewater treatment plant in place and it does an excellent job at making the water safe for the environment.
With another layer of filtration, we’ll be able to use that water to irrigate the plants at our farm. And that’s what we call closing the loop. Learn more about us as:
Request a Quote From Us
To get the best possible price and lead time estimate, please include the number of designs and pieces per design, fabric choice, sizes, and printing options.
- FUSH˚ Addresses:
- Velizara Stankovića 67
Belgrade, Serbia (view in Google Maps) - Oraovačka BB
Oraovica, Serbia (view in Google Maps)
- Velizara Stankovića 67
- Phone: +381 11 359 10 48
- Email: info@fush.rs